Free shipping for orders over $1000 - no pickup, contact our team today on 1300 024 748 for pre-sales support, hardware pre-configuration or to discuss your next project!

Elite Screens VMAX2 VMAX150XWV2-E24 381 cm (150") Electric Projection Screen

  • Part: 2121581
  • Model: VMAX150XWV2-E24
$2,226.00
FREE DELIVERY

Availability

Out of Stock

  • General Information
    • Manufacturer
    • Elite Screens, Inc
    • Manufacturer Website Address
    • http://www.elitescreens.com
    • Brand Name
    • Elite Screens
    • Product Line
    • VMAX2
    • Product Type
    • Projection Screen

VMAX150XWV2-E24 Electric Projection Screen has built-in adjustable vertical limit switch to regulate drop/rise settings. It has durable metal casing for wall/ceiling installation and standard 4-side black masking borders.

  • Technical Information
    • Diagonal Image Size
    • 381 cm (150")
    • Screen Height
    • 228.6 cm (90")
    • Screen Width
    • 304.8 cm (120")
    • Screen Fabric
    • MaxWhite Fiberglass
    • Front Projection
    • Yes
    • Aspect Ratio
    • 4:3
    • Screen Gain
    • 1.1
    • Viewing Angle
    • 180°
    • Screen Folding Mechanism
    • Electric
  • Physical Characteristics
    • Mount Type
    • Wall/Ceiling Mount
    • Height
    • 2989.6 mm
    • Width
    • 3380.7 mm
    • Depth
    • 78.7 mm
    • Weight (Approximate)
    • 19.69 kg
  • Miscellaneous
    • Additional Information
      • Tensioned : No
      • Drop : 24"
      • Housing/Bracket Height : 4.1"
      • Case Color : White
    • Assembly Required
    • No